Home / Solutions / Aerospace & Defense / Tool Traceability
SOLUTIONS · AEROSPACE TOOL TRACEABILITY

What a Tool Change Actually Costs — Records Before Geometry

On a qualified aerospace part, the expensive part of changing a tool is rarely the tool. It is the first-article, the batch record and the requalification that follows. That cost is why so many programmes run a tool that is no longer the best one available, and it is why the useful question at the RFQ stage is how much of the existing evidence a new geometry can reuse. This page sets out what a tool record has to contain, where it is allowed to stop, and what we will and will not claim about it. It is a process page — the part-level work is on the sibling subpages.
THE REAL CONSTRAINT

A tool is qualified as a geometry, not as a supplier

When a process is approved, what is approved is a specific cutting geometry running inside a specific window. That has three consequences that surprise buyers:

  • Same drawing, different cutter, new evidence. Two tools that share a nominal diameter but differ in rake, margin or edge prep do not cut the same hole. A change of geometry is a change of process even when the part number does not move.
  • The record has to be reproducible, not impressive. A tool-life figure from one favourable run is worth less than a modest figure held across several batches, because the second one predicts what the next batch will do.
  • Requalification scope is negotiable; the fact of it is not. Whether a change needs a full first-article or a reduced comparison depends on the customer and on what changed. That scope is worth agreeing before the tool is made, not after.

The sample and first-article steps themselves are described on Sample Validation Process. This page does not repeat them; it addresses what a tool record contains and how a change is scoped.

RECORD CONTENT

What a tool record should be able to answer

Question asked laterWhat the record has to holdWhere it comes from
Which tool made this part?Batch identification that resolves to a drawing revision and a manufacturing dateAgreed at order, marked on the package
Is it the geometry that was approved?Nominal geometry drawing with the revision the part was approved againstFrozen at first-article, not reissued silently
Has this tool drifted?Measured geometry at defined points, and the inspection method usedInspection plan agreed per project
How long did it last?Life expressed in a unit both sides use — holes, parts or metres — and the failure mode observedTrial and production feedback
What changed, and when?A change log with the reason, not only the dateMaintained per tool, not per order
SCOPING A CHANGE

Three levels of change, three sizes of evidence

What changedTypical evidence scopeNote
Coatings or substrate on an unchanged geometryComparison run on the same part, same windowCheapest to justify; still needs the comparison, not an assertion
Edge prep or margin, same nominal dimensionsHole-quality comparison plus a life comparisonThe usual case, and the one most often under-documented
Rake, flute count or step geometryFull first-article against the part drawingThis is a new process; treat it as one

These are the scopes we see most often, not a rule that overrides your customer's quality plan. Where the plan is stricter, the plan wins.

WHAT WE WILL NOT CLAIM

The honest boundary on evidence

  • We do not publish a certification claim. If your plan requires a specific approval, say so on the RFQ and we confirm what can and cannot be supported before a quote is issued.
  • Workshop images are resources, not results. Grinding, laser and inspection equipment show capability to make a tool; they do not prove a tolerance, a tool life or a cycle time. That framing is set out on Manufacturing & Quality Evidence and it applies here too.
  • No invented numbers. Where a figure is not from a real run on a real part, it is not written down. Where a value is pending, it is marked pending rather than estimated.
WHERE THIS PAGE STOPS

Boundaries, so you do not read the wrong page

RFQ MUST-SEND

What to send so the evidence scope can be quoted with the tool

  • The approved geometry drawing, if a tool is already qualified on this part
  • Your customer's quality plan requirement, quoted rather than summarised
  • What you want to change, and the defect or cost that motivates it
  • How tool life is measured today, and in what unit
  • Batch size and whether a comparison run is possible on a real part
  • Which records must travel with the parts, and in what format
FAQ

Quick answers before you RFQ

Can you reverse-engineer a tool from a qualified sample?

Usually yes, and it is a normal starting point rather than an exception. Send the sample with the part print and the qualified window. What we will not do is claim the copy is dimensionally identical without measuring it, so the geometry is reported back before any batch is made.

Do you provide first-article documentation?

We provide the measured geometry and the inspection record agreed for the project, and we work to the acceptance criteria you specify. We do not issue a certificate we are not accredited to issue — if your plan requires one, that requirement is raised and confirmed at RFQ stage so nobody discovers the gap after the tool is made.

How is tool life reported?

In the unit the shop already uses — holes, parts or metres — with the failure mode stated. A number without a failure mode is not useful, because a tool that fails by chipping and a tool that fails by wear call for different corrective actions.

Is this the same as the sample validation page?

No. Sample Validation Process describes the steps of proving a tool on a part. This page describes what a tool record has to contain and how much evidence a given change requires — which is the question that comes up after the tool is already approved.

ENGINEERING QUOTE

Send the approved geometry and the quality plan requirement

Scope of evidence is quoted with the tool, not added afterwards. Where a certification or approval is required, it is confirmed before a price is issued.