Most supplier audits fail for the same reason: the checklist is a list of documents rather than a list of observations. A certificate proves that a system was audited once; it does not prove that the gauge on the bench was calibrated this year.

This page is a working audit sheet for a cutting tool maker. It has six sections, a hundred points, and for every item an observation that decides the score rather than a document that suggests it.

Six sections carry the score: quality system, equipment and calibration, material traceability, inspection and release, rework and regrind, delivery and packing. Each item scores 0, 1 or 2, and the weight of each section is fixed so that the total is 100.

The scoring rule that matters is the floor: below 60 points, do not approve a first article, because the evidence that would make the first article meaningful is not there.

The quality evidence a supplier can send before an audit is on the manufacturing quality evidence page. This page is the on-site version.

How to use this checklist

There are two versions. The half-day version covers sections 1, 3 and 4 and is enough to decide whether a second visit is worth the time. The full-day version adds equipment observation, the regrind area and the packing line.

Score each item 0, 1 or 2. A 2 means the practice was observed and the record matched it. A 1 means the record exists but the practice was not observed, or the practice was observed without a record. A 0 means neither.

The distinction between 1 and 2 is the point of the exercise. A supplier with good records and a shop floor that ignores them scores 1, and a supplier whose practice is good but undocumented also scores 1, because neither can be relied on by a third party.

One structural note: a supplier who hands over this sheet before the visit is displaying something a document pack cannot. It means the supplier expects to be observed, which is a different claim from expecting to be read.

Sections 1 and 2: system and equipment (34 points)

Check the certificate against the issuing body's public register rather than against the PDF. A certificate number that cannot be found is a red flag regardless of how the document looks.

Ask for the document control procedure and then ask to see a drawing in use on the shop floor. The revision on the print should match the revision in the system, and the two should be checkable in under a minute.

Ask what happens to a tool that fails inspection. The answer should describe a physical location and a disposition authority, not a process flow diagram.

Then move to equipment. Walk the grinding area and pick three machines at random. For each, ask for the maintenance record and the last accuracy check; the record should exist for the machine, not for the department.

Then walk to the inspection area and pick up a gauge. Every gauge should carry a calibration sticker with a date, and the date should be inside the interval. A gauge without a sticker is a finding even if the calibration record exists in a file.

Ask how the shop verifies a grinder's positioning accuracy, and how often. The answer separates a shop that maintains machines from a shop that repairs them.

Sections 3 and 4: material and inspection (38 points)

Take a finished tool and ask to see the blank it came from. The route back should pass through a batch number to a supplier certificate with a grade and a grain size where the material is diamond.

The traceability that a buyer should be able to ask for in writing is set out in capability data to request from a tool supplier.

Ask what happens when a blank batch is found to be out of specification after tools have shipped. The answer should include a list of affected tools, which means the traceability has to work forwards as well as backwards.

Look at the storage. Carbide and diamond blanks stored without separation, or without protection, is a finding that costs nothing to fix and says a lot about the rest.

This is the heaviest section because it decides whether anything else can be trusted. Ask for a recent first-article report and read it as a buyer would: does it name the instrument, its calibration status, the measurement method and the values against the drawing?

A report that gives only pass or fail, or that gives values without an instrument, cannot be audited. A report with an instrument identifier and a calibration date can be checked against the gauge on the bench, which is the test that matters.

Ask who has the authority to release a batch, and what happens when that person is absent. A release authority that exists only in one person's head is a single point of failure in the quality system.

The inspection findings are easier to interpret against a live sample. The sample validation process describes what a first article should contain when it is run properly, and it is the standard to hold the audit against.

Sections 5 and 6: rework, packing and delivery (28 points)

The regrind area is where a supplier's honesty shows. Ask how many tools were reground last month, what the remaining life assessment was, and where the record lives. A shop that regrinds without a log cannot tell a customer whether a returned tool is the same tool.

Ask what happens to a tool that fails after regrinding, and whether the requalification includes a first-article check or only a dimensional check.

Then look at packing. Diamond edges are fragile, and a tool that arrives with a chipped edge was damaged after inspection or packed without protection.

The packing specification and the shipping documents complete the audit, because a tool that cannot be traced to a delivery note cannot be contained in a recall.

The scorecard

Print this table and score in the last column. The points are fixed; the observation column is what the auditor looks at.

ItemWhat to observePoints
1.1 Certification valid and verifiableCertificate found on the issuing body's register, scope covers cutting tools4
1.2 Document and revision controlShop-floor drawing revision matches the system record4
1.3 Nonconformance and dispositionA physical quarantine area and a named disposition authority4
1.4 Purchased process controlCoating, heat treatment and subcontract grinding listed and approved4
2.1 Equipment registerEvery grinder and measuring machine listed with an identifier4
2.2 Machine maintenanceMaintenance record per machine, not per department4
2.3 Calibration recordsSticker on the gauge, date inside the interval, record traceable4
2.4 Measuring capabilityCapability check on the instruments used for the tightest tolerance6
3.1 Blank supplier identityNamed blank supplier and grade on the certificate4
3.2 Batch to certificate linkFinished tool traced back to a blank batch and its certificate4
3.3 Incoming inspectionRecorded check of blanks on receipt, with the criteria used4
3.4 Storage and segregationBlanks protected and separated by grade; no mixed bins4
4.1 First-article report contentValues against drawing, method, instrument and calibration status6
4.2 Instrument identification on reportsReport names the gauge; the gauge can be found and checked4
4.3 Sampling planStated plan, stated frequency, stated reaction to a nonconformance4
4.4 Release authorityNamed authority with a documented deputy4
4.5 Traceability of released batchesBatch record links tool serials to the inspection result4
5.1 Regrind logNumber of tools, dates, remaining life assessment4
5.2 Rework approvalRework defined and approved before it happens, not after4
5.3 Requalification after regrindFirst-article or dimensional check with a record4
5.4 Customer tool identificationReturned customer tools tracked separately and returned to the right owner4
6.1 Packing specificationEdge protection defined and used; a sample pack inspected4
6.2 Labelling and traceabilityLabel matches the delivery note and the inspection record4
6.3 Shipping documentsDocuments allow containment of a batch if a recall is needed4

The total is 100. A score above 85 with section 4 above 18 is a supplier whose evidence can be relied on. A score between 60 and 85 is workable with a defined improvement list. Below 60, the first article is not the next step.

Red flags

These ten findings are sufficient on their own to stop an approval until they are resolved. They are chosen because each one makes some other evidence unverifiable.

FindingWhy it stops the approval
Certificate number not found on the issuing body's registerEverything that relies on the certified system is unverified
Gauge on the bench with no calibration stickerThe measurement that accepts the tool cannot be trusted
First-article report without an instrument identifierThe report cannot be checked against the equipment
No regrind logA returned tool cannot be shown to be the same tool
No physical nonconformance areaSuspect tools cannot be separated from good ones
Drawing revision on the floor differs from the systemThe manufactured tool may not be the approved design
Subcontracted coating not listedThe process route described is not the process route used
Blanks stored in unlabelled binsMaterial traceability ends at the bin
Release authority held by one person with no deputyA single absence stops the quality system
Packing without edge protection for a diamond toolDamage after inspection is invisible in the record

A red flag is not necessarily a rejection. It is a finding that has to be closed, with evidence, before the first article means anything.

Where the audit is the start of a supply relationship rather than a review of an existing one, the commercial and technical route runs through the custom cutting tool RFQ.

What happens when a tool then fails its first article, and what evidence the buyer should expect, is in nonconformance and 8D for cutting tools.

An audit checks the supplier behind every gate. Which gate produces which document, and what an audit can then verify, is set out in the procurement sequence this checklist supports.

What published sources say about this

These pages support the measurement, capability and tolerance logic that the checklist tests. Each is cited for what it states, under its own conditions.

  • Dimensioning and Tolerancing (ASME Y14.5): the definitions an inspection report has to reference for the audit to be meaningful.
  • What is a measurement system? (NIST/SEMATECH e-Handbook): the components of measurement variation, the basis for checking instrument capability rather than presence.
  • What is Process Capability? (NIST/SEMATECH e-Handbook): process spread against specification, which is what a first-article report should eventually demonstrate.
  • What are control charts? (NIST/SEMATECH e-Handbook): the time-ordered record that shows whether a process is stable or drifting.
  • Bias and variability (NIST/SEMATECH e-Handbook): separating a repeatable offset from a random spread, relevant when a gauge is checked against a reference.
  • Reamers, machine reamers (toolmaker technical overview): the construction that a first-article report is describing.
  • Reaming and fine boring (toolmaker competence page): the finishing families, used here to show what an inspection plan has to measure.

Outbound references are listed because the reasoning depends on them, not as endorsements. Scores are awarded by the auditor against observed evidence; no supplier is scored on this page.

Frequently asked questions

How long does the half-day version take?

About four hours for sections 1, 3 and 4, including the walk through inspection and the document checks.

It is enough to decide whether a full audit is worth scheduling, and it usually surfaces one or two red flags.

What is a passing score?

Above 85 with section 4 above 18 is a supplier whose evidence can be relied on. Between 60 and 85 is workable with an improvement list.

Below 60, the first article is premature; the evidence that would make it meaningful does not exist yet.

Should the supplier score itself first?

Yes, and the self-score should be compared with the audit rather than accepted. A large gap is itself a finding.

A supplier that scores itself honestly is easier to work with than one that scores 100 and expects the audit to agree.

Why is inspection weighted so heavily?

Because it is the section that makes every other claim checkable. A good grinding area with an unauditable inspection record cannot release a tool.

The weights reflect that dependency, not the cost of the equipment.

Can the checklist be used for a distributor?

Partly. Sections 1, 4 and 6 apply; the equipment and regrind sections apply only if the distributor holds stock or offers regrind.

For a distributor programme, the commercial structure is covered on the distributor cutting tool program page.

Author: Kevin Zeng, Operations Director, HENTRY

Engineering review: Jiack Liu, Engineering Director

Updated 14 November 2026: first publication. Scope: the six audit sections and their observations, the 100-point scorecard with the 60-point floor, and ten red flags.

No supplier, including HENTRY, is scored on this page; the self-assessment column is for the supplier to complete and the auditor to verify.